built-in DGC XXL build-under, installation drawing
Worktop overhang ≤ 29 mm
for steam cooking, baking, roasting with networking + BrilliantLight.
built-in DGC XXL build-under, installation drawing
Worktop overhang ≤ 29 mm
H7000 handle, installation drawing
1) 400 mm, 2) 360 mm, 3) 47 mm, 4) 24 mm, 5) 32.5 mm
built-in DGC XXL, installation drawing
DGC7x6x, DGC7x6xX installation drawings
Seitenansicht DGC XXL, installation drawing, GB, AU
22 mm glass, 23,3 mm stainless steel
DGC7x60 connections and ventilation 60cm, installation drawing
1) Front view, 2) Mains connection cable, L=2.000 mm, 3) Ventilation cut min. 180 cm², 4) Ventilation and deaeration, 5) No connection in this area
Installation DGC XXL, ESW7x20 installation drawings
Installation_DGC_XXL_ESW7x10_EVS7010 installation drawings
screw joint DGC XXL, installation drawing